Jumbo – Agora Mall

Centro Cuesta Nacional (CCN)

Design, supply and installation of general electrical and lighting systems, to Jumbo hypermarket, anchor store of Agora Mall, with 7,800 M² of new construction divided into two levels of supermarket and department store with its respective warehouse area and loading dock located in the basement. The electrical works included: Main feeder at 12.47 KV medium voltage, integrated substation with transformation at 12.470-480Y/277 volts and installed distribution for 1,500 KVA, general circuits of low voltage power at 480 and 208 volts (feeders and outputs), load centers distribution, general lighting system, among other facilities.

Ave. Abraham Lincoln at corner of Ave. John F. Kennedy, Santo Domingo, 2011-2012