Merca Santo Domingo

Client

Constructor, Consulting & Engineering (CCE)

Type

Infrastructure

Location

Km. 22 Autopista Duarte, Santo Domingo

Date

2011-2012

Design, civil and electrical works of the general power distribution infrastructure at 12,47 KV medium voltage for a 3,500 KVA load capacity, general street and parking complex lighting with more than 1 million square meters for the “Merca Santo Domingo”.

The electrical works included: Main feeder and medium voltage distribution at 12.47KV included: a one kilometer long 3 phase aerial power line, built in prestressed concrete poles and aluminum AAAC conductor, and 2.2 kilometers of underground 3 phase insulated conductor line at 15 KV. General street and parking lot lighting system, with 239 high pressure sodium luminaires mounted in prestressed concrete poles.