Gas Turbine (Higuamo-Itabo)
Client
GEC Alsthon
Type
Generation
Location
Santo Domingo/San Pedro de Macorís
Date
1998
Installation of electrical power, lighting, control, instrumentation, pre-commissioning, and start-up assistance works for 5 – 35MW gas turbines. 3 units located at the Itabo Power Park, and 2 units located at the Higuamo Power Park.