AES Andrés LNG Power Plant

Client

PMSI

Type

Generation

Location

Boca Chica, Santo Domingo

Date

2006

Detailed engineering, installation of electrical, control, instrumentation, pre-commissioning, and start-up assistance works for the 5.4MW LNG power plant with 4 -1.35MW encapsulated Deutz engines located at the AES terminal at Andres.

Related Projects