Perimeter Security Lighting
Client
COSTASUR
Type
Infraestructura
Location
>La Romana
Date
2019
Supply and installation of electrical works for 13.5km of security perimeter lighting from Rio Chavon to K4 station.
The electrical works include:
- Supply and installation of main electrical equipment.
 - Lighting in concrete poles.
 - Canalizations for Data (fiber optics).
 - Low Voltage power distribution.