Mirador Norte Model City

Consorcio Moya Jorge

Engineering, materials supply, installation and associated civil works for the infrastructure works of medium voltage power distribution which includes: 36 – 15KV switchgear units for load distribution, 42,000 m of 15kV, URD type cable, 24,000 m of buried PVC pipe, and general street lighting with 230 -250W, HPS fixtures.

Santo Domingo, 1999-2000

[gallery_bank type=”images” format=”thumbnail” title=”false” desc=”false” responsive=”true” display=”all” sort_by=”random” special_effect=”none” animation_effect=”fadeIn” album_title=”false” album_id=”67″]